Melocheville Tunnel Sidewalk | PJCCI
Melocheville Tunnel Sidewalk
Closed for the winter season
No hindrance in progress

Planned hindrances

Sat
01 Apr
Sun
02 Apr
Mon
03 Apr
Tue
04 Apr
Wed
05 Apr
Thu
06 Apr
Fri
07 Apr
Sat
08 Apr
Sun
09 Apr
Mon
10 Apr
Tue
11 Apr
Wed
12 Apr
Thu
13 Apr
Fri
14 Apr

Work advisories

From December 4, 2022 to April 8, 2023
Champlain Bridge Estacade | Winter closure of the Champlain Bridge Estacade bicycle path on December 4
From March 30 to April 30 , 2023
Melocheville Tunnel - Opening of the sidewalk, on Friday, March 31
1 / 1
Melocheville Tunnel Sidewalk

Melocheville Tunnel Sidewalk

Located near the Beauharnois generating station, the Melocheville Tunnel passes directly under the St. Lawrence Seaway to maintain a constant flow of vehicles—and pedestrians! In fact, the tunnel has a dedicated sidewalk that lets you safely walk the 1.4 km under the river.

Schedule

Summer season schedule: open 24 hours a day, 7 days a week*.
 

*JCCBI would like to remind you that throughout the summer season, occasional closures will be necessary in order to perform some maintenance work and that it is essential to respect the closure notices for safety reasons.
 

Winter season schedule: closed*
 

* The start date of the winter season schedule is set by the City of Beauharnois.

 


 

At all times, JCCBI invites pedestrians and cyclists to be cautious and courteous on the paths and follow all safety instructions.

 

Get the latest information about JCCBI’s bicycle and pedestrian network: 

     • Consult the Active Mobility work advisories
     • Follow us on Twitter @mobiliteactive
     • Subscribe to our Active Mobility email alert

 

Have a good trip and stay safe!

Schedule
Go to top